国内激情视频,一区二区免费在线观看视频,av免费观看大全,人人爽爽爽,日韩专区av,这里只有精品18,亚洲精品国产一区二区三区

2 tunnels dug through in China-Laos Railway construction

Source: Xinhua| 2019-04-15 19:28:29|Editor: zh
Video PlayerClose

LAOS-OUDOMXAY-CHINA-LAOS RAILWAY-TUNNEL CONSTRUCTION

A staff member of China Railway No. 5 Engineering Group stands at the entrance to Nathong No. 2 Tunnel of China-Laos Railway after the tunnel was dug through in Oudomxay Province of Laos, some 400 km north of Lao capital Vientiane, April 15, 2019. Two tunnels of the China-Laos Railway, namely Nathong No. 2 and Nateuy No. 2, were dug through on the same day on Monday by the constructor China Railway No. 5 Engineering Group. (Xinhua/Hu Yong)

   Prev 1 2  

KEY WORDS:
YOU MAY LIKE
EXPLORE XINHUANET
010020070750000000000000011100001379790851